Drayage is not regular shipping.
Getting freight from the loading dock to your booth is a separate, fee-based service — billed by weight and handled by the show contractor. It is often the most unexpected line in an exhibitor's budget.
4545 W Hacienda Avenue, Suite 102–103
Las Vegas, NV
7,800 sq. ft. design & production space
A practical guide for international exhibitors, export brands, and first-time U.S. trade show participants — booth planning, show deadlines, venue rules, material handling, electrical services, and the steps in between.
Many international exhibitors are surprised by how structured the U.S. trade show system is. Booth design is only one part of the process. Deadlines, service forms, labor rules, material handling, electrical orders, and move-in schedules can directly affect cost and execution. This guide walks through the planning steps that matter most — so the only surprise on the show floor is how smoothly everything goes.
Every U.S. trade show has its own exhibitor manual, deadlines, contractor rules, venue regulations, and service forms. This guide is a planning overview — final requirements should always be confirmed through the official show manual.
Not our production schedule — your decision calendar. Starting early reduces rush decisions, missed deadlines, and unexpected show-floor limitations.
Secure booth space, review the floor plan, define goals, and start the booth direction — before major service deadlines approach.
Confirm booth size, budget, and design direction. Review the show manual for height limits, line-of-sight rules, EAC forms, insurance requirements, and key service deadlines.
Approve booth design, start production planning, prepare graphics at production resolution, and review electrical and service needs before deadlines.
Submit show forms, coordinate EAC requirements, confirm insurance/COI, and finalize freight and material handling planning with related providers.
Confirm move-in schedule, installation access, badges and wristbands, the outbound plan, and final booth details.
The booth is installed to the approved plan, inspected for details, cleaned, and made show-ready before the floor opens.
Many unexpected costs and delays have nothing to do with booth design. They come from show services, venue rules, labor requirements, deadlines, and international preparation.
Getting freight from the loading dock to your booth is a separate, fee-based service — billed by weight and handled by the show contractor. It is often the most unexpected line in an exhibitor's budget.
Power does not come with the booth space. Outlets, drops, and labor are ordered through the show's service kit — and prices climb sharply after the advance deadline.
In many U.S. venues, certain work — electrical, rigging, sometimes booth assembly — must be performed by union labor. What exhibitors may do themselves varies by city, venue, and show.
Booth height limits, hanging sign rules, and line-of-sight restrictions depend on your booth type and location. A design that works as an island may not be allowed inline.
Carpet, cleaning, furniture, rigging, internet — most services run through the official show contractor, each with its own form and deadline inside the exhibitor manual.
Temporary imports, commercial invoices, and customs timing add weeks to the schedule. Booking a trade-show-experienced freight forwarder early is one of the best decisions an exhibitor can make.
These terms appear in every exhibitor manual, service kit, and show-floor conversation. Understanding them early makes planning much easier.
The handling of freight between the dock or warehouse and your booth — a paid show service, separate from shipping.
The official term for drayage in most exhibitor manuals; usually billed per CWT (hundredweight).
Installation & Dismantle — the labor that sets up your booth before the show and takes it down after.
Exhibitor Appointed Contractor — a non-official contractor (such as your booth builder) that must be registered with the show by a deadline.
Certificate of Insurance — proof of liability coverage that venues and shows require from contractors working on the floor.
The show's official rulebook: deadlines, order forms, regulations, and service pricing in one document.
A facility that receives freight before the show and delivers it to your booth at move-in — earlier deadline, more predictable handling.
Freight sent straight to the venue within a tight delivery window during move-in.
Hanging structures or signs from the ceiling — ordered separately and performed by authorized venue labor.
The specific date and time slot the show assigns your booth for freight delivery and installation start.
The form that authorizes the show contractor to receive, move, and handle your freight at the show.
Rules that protect visibility for neighboring booths — they shape what can be built and where.
We help exhibitors plan the booth-related scope clearly — from design direction and production timing to installation coordination and show-floor readiness.
Booth size, layout priorities, product display needs, meeting zones, storage, and visitor flow.
The approved concept aligned with production timing, structural details, finishes, and show-floor practicality.
Booth elements prepared to support brand visibility, product communication, and visitor engagement.
The booth-related details that affect installation: access, timing, finishing, and show-ready presentation.
A clean, polished, brand-aligned booth environment — ready before the floor opens.
A practical operational checklist for exhibitors and project teams — deadlines, coordination, and decisions in one printable document.
After 15 years on show floors, we've learned what actually makes a booth work. It's never the size — it's how the space does business.
Sightlines, lighting, and one clear message decide whether attendees stop — long before they read a single word about your product.
Clean construction, consistent branding, and considered details tell visitors how you do business everywhere else.
An open entry, natural circulation, and a comfortable place to sit are what turn foot traffic into twenty-minute meetings.
Three days, one goal. Every layout decision should answer the same question: does this help close business?
General planning guidance — exact requirements depend on the show, venue, exhibitor manual, and project scope.
For a custom booth, 16 or more weeks before the show is a safe starting point — earlier for large islands or first-time exhibitors. Booth space itself is often booked months before that.
It is the paid service of moving your freight between the dock or advance warehouse and your booth. It is billed by weight, handled by the show contractor, and budgeted separately from shipping.
Yes. Power is not included with booth space. Outlets, power drops, and electrical labor are ordered through the show's exhibitor kit, and advance-deadline pricing is significantly cheaper than on-site orders.
Yes, with early planning. Temporary import options, commercial invoices, and customs timing should be coordinated with a licensed freight forwarder and customs broker experienced in trade shows.
An Exhibitor Appointed Contractor — any contractor you bring that is not the show's official contractor, such as your booth builder. EACs must usually be registered with the show and provide a Certificate of Insurance by a set deadline.
Many venues do. Depending on the city and venue, work such as electrical, rigging, or booth assembly may need to be performed by union labor. The show manual defines what exhibitors may do themselves.
We handle the booth-related scope end to end: design, production, graphics, installation coordination, and show-floor readiness. Freight, customs, and official show services remain with licensed providers — and we plan the booth around their timelines.
The show name and dates, booth size and location on the floor plan, your goals for the show, the products you will display, a budget range, and your brand assets. With these, a builder can give you a realistic direction quickly.
We work through these details every show. Ask us anything before your next booth project begins.